JoVE Logo

サインイン

8.6 : Vibrating Concrete

Mechanical vibrators are instrumental in compacting newly poured concrete within formwork and around reinforcements. This process is essential to eliminate trapped air pockets and establish a dense concrete mass. One widely used method is vibrating by internal vibrators, often referred to as a poker vibrator or immersion vibrator. It is rapidly inserted through the full depth of the freshly laid concrete and slightly extends into the layer below it (which remains in a plastic state). Consistent vibrations are applied across the concrete surface at intervals of every 2 to 3 feet for a period of 5 seconds to 2 minutes, depending on the consistency of the concrete mix. As the vibrator is slowly withdrawn, the hole left behind is naturally sealed, preventing the formation of voids.

Another method employs external vibrators that are attached to the formwork to vibrate the formwork and the concrete simultaneously. This is used for precast elements or thinner sections of concrete. In contrast to internal vibrators that directly vibrate the concrete, external vibrators do additional work by vibrating the formworks, making them less efficient than the internal vibrators. Occasionally, external vibrators have to be shifted from place to place depending on the placement of the concrete. For precast concrete units, a vibrating table is used, wherein the formwork is fixed directly onto the platform to achieve a uniform vibration throughout the unit.

タグ

Vibrating ConcreteMechanical VibratorsConcrete CompactionInternal VibratorsPoker VibratorImmersion VibratorExternal VibratorsPrecast ElementsFormwork VibrationConcrete Mix Consistency

章から 8:

article

Now Playing

8.6 : Vibrating Concrete

Mixing, Placing and Curing Concrete

71 閲覧数

article

8.1 : Mixing Concrete

Mixing, Placing and Curing Concrete

102 閲覧数

article

8.2 : Mixing Time

Mixing, Placing and Curing Concrete

138 閲覧数

article

8.3 : Ready Mixed Concrete

Mixing, Placing and Curing Concrete

78 閲覧数

article

8.4 : Pumped Concrete

Mixing, Placing and Curing Concrete

60 閲覧数

article

8.5 : Placing Concrete

Mixing, Placing and Curing Concrete

72 閲覧数

article

8.7 : Shotcrete

Mixing, Placing and Curing Concrete

52 閲覧数

article

8.8 : Preplaced Aggregate Concrete

Mixing, Placing and Curing Concrete

91 閲覧数

article

8.9 : Finishing Concrete

Mixing, Placing and Curing Concrete

80 閲覧数

article

8.10 : Curing of Concrete

Mixing, Placing and Curing Concrete

88 閲覧数

article

8.11 : Curing Methods

Mixing, Placing and Curing Concrete

71 閲覧数

article

8.12 : Accelerated Curing of Concrete

Mixing, Placing and Curing Concrete

106 閲覧数

JoVE Logo

個人情報保護方針

利用規約

一般データ保護規則

研究

教育

JoVEについて

Copyright © 2023 MyJoVE Corporation. All rights reserved