Preplaced aggregate concrete is ideal for construction environments that are not easily accessible. The process begins by properly wetting the gap-graded coarse aggregates to remove the dirt, then placing it in the form and compacting it. Voids are filled with a mortar mix pumped under pressure through slotted pipes. This mortar typically consists of Portland cement, pozzolan, fine aggregates, water, and a fluidizing aid. The pozzolan helps reduce bleeding and segregation while improving the fluidity of the mortar, whereas the fluidizing aid delays the setting of the mortar. A cement-fine sand mortar is also used. It is prepared in a high-speed colloid mixer to keep the cement suspended until the mortar is pumped. As the mortar rises to the top, the pipe is gradually withdrawn. Applying external vibration to the top layer of the mortar can enhance the finish of the exposed surfaces.

Preplaced aggregate concrete is favored for its uniformity and reduced risk of segregation, which is essential for constructing nuclear shields and underwater projects. Due to its low shrinkage and permeability, preplaced concrete is used in water-retaining structures, large monolithic blocks, and repair works. In large-scale construction, refrigerated water is circulated around the aggregates before adding the mortar to control the heat from cement hydration. In contrast, steam is circulated to prevent frost damage in cold conditions.

Теги

Preplaced Aggregate ConcreteConstruction EnvironmentsGap graded Coarse AggregatesMortar MixPortland CementPozzolanFine AggregatesFluidizing AidSegregationCement fine Sand MortarHigh speed Colloid MixerExternal VibrationNuclear ShieldsUnderwater ProjectsLow ShrinkagePermeabilityWater retaining Structures

Из главы 8:

article

Now Playing

8.8 : Preplaced Aggregate Concrete

Mixing, Placing and Curing Concrete

90 Просмотры

article

8.1 : Mixing Concrete

Mixing, Placing and Curing Concrete

98 Просмотры

article

8.2 : Mixing Time

Mixing, Placing and Curing Concrete

133 Просмотры

article

8.3 : Ready Mixed Concrete

Mixing, Placing and Curing Concrete

74 Просмотры

article

8.4 : Pumped Concrete

Mixing, Placing and Curing Concrete

57 Просмотры

article

8.5 : Placing Concrete

Mixing, Placing and Curing Concrete

67 Просмотры

article

8.6 : Vibrating Concrete

Mixing, Placing and Curing Concrete

69 Просмотры

article

8.7 : Shotcrete

Mixing, Placing and Curing Concrete

49 Просмотры

article

8.9 : Finishing Concrete

Mixing, Placing and Curing Concrete

79 Просмотры

article

8.10 : Curing of Concrete

Mixing, Placing and Curing Concrete

84 Просмотры

article

8.11 : Curing Methods

Mixing, Placing and Curing Concrete

70 Просмотры

article

8.12 : Accelerated Curing of Concrete

Mixing, Placing and Curing Concrete

102 Просмотры

JoVE Logo

Исследования

Образование

О JoVE

Авторские права © 2025 MyJoVE Corporation. Все права защищены