Войдите в систему

The Average Fixed Cost, or AFC curve, is the graphical representation of the average fixed cost. It starts at the first unit of output. As the level of output increases, the same fixed cost is allocated across more units, leading to a decrease in the AFC. This relationship results in a downward-sloping AFC curve across all potential levels of output. The curve approaches zero but never actually reaches it.

The Average Variable Cost (AVC) curve begins when the output is one unit. At low levels of output, the firm benefits from increasing returns. However, as output grows, the firm eventually experiences diminishing returns. This pattern of increasing and then diminishing returns results in the U-shaped AVC curve.

The ATC curve represents the average total cost of production. Since average total cost combines both average variable cost and average fixed cost, and the AFC curve declines consistently, the gap between the ATC and AVC curves decreases as output increases.

Теги

Average Fixed CostAverage Variable CostAverage Total CostAFC CurveAVC CurveDiminishing ReturnsU shaped CurveProduction CostOutput LevelsCost Allocation

Из главы 7:

article

Now Playing

7.5 : Average Fixed, Average Variable, and Average Total Cost II

Costs

88 Просмотры

article

7.1 : Sunk and Opportunity Cost

Costs

141 Просмотры

article

7.2 : Fixed and Variable Cost

Costs

96 Просмотры

article

7.3 : Total Fixed, Total Variable, and Total Cost Curves

Costs

170 Просмотры

article

7.4 : Average Fixed, Average Variable, and Average Total Cost I

Costs

130 Просмотры

article

7.6 : Marginal Cost I

Costs

77 Просмотры

article

7.7 : Marginal Cost II

Costs

127 Просмотры

article

7.8 : Relationship between Average and Marginal Costs

Costs

191 Просмотры

article

7.9 : Nature of Costs in the Long Run

Costs

68 Просмотры

article

7.10 : Short-run vs Long-run: Average Costs

Costs

59 Просмотры

article

7.11 : Short-run vs Long-run: Marginal Costs

Costs

225 Просмотры

article

7.12 : Economies of Scale

Costs

63 Просмотры

article

7.13 : Diseconomies of Scale

Costs

61 Просмотры

article

7.14 : Economies of Scope

Costs

108 Просмотры

JoVE Logo

Исследования

Образование

О JoVE

Авторские права © 2025 MyJoVE Corporation. Все права защищены